Tile Installation FAQ
Real answers to questions we hear from homeowners in Sacramento, Del Paso, and Natomas before, during, and after a tile job.
Before the Job Starts
Do I need to remove the existing tile before you arrive, or do you handle demo?
We handle tile demolition as part of most jobs — it's something we prefer to do ourselves so we can assess the substrate condition as we go. Existing tile, cement board, and old thinset all come out, and we inspect what's underneath before any new material goes down. If you want to do demo yourself to save cost, we're open to it, but we'll want to confirm the substrate is in acceptable shape before we commit to a start date.
How do you handle subfloor leveling for floor tile?
Floor tile requires a flat surface within 1/8 inch over 10 feet — that's the industry standard, and we check it before anything else. Low spots get filled with floor-leveling compound; high spots get ground down. Skipping this step is the most common reason tile cracks or grout lines crumble after a year of use. We don't skip it.
What does a typical estimate include?
Our written estimates cover labor, materials we supply (thinset, grout, backer board, waterproofing membrane), and any prep work like leveling or demo. Tile itself is usually purchased by the homeowner so you can choose exactly what you want — we'll tell you how much to order. If we find something unexpected during demo, we contact you before proceeding, not after.
During Installation
How long does a shower tile installation take?
A standard walk-in shower — three walls, a niche or two, and a tiled floor — typically runs two to four days of actual work. Day one is usually waterproofing and backer board. Day two is setting the wall tile. Day three finishes the floor and any trim pieces. Grout goes in after the thinset has fully cured, which means at least 24 hours. Larger showers with intricate patterns take longer; we'll give you a realistic timeline at the estimate stage.
What is a tile leveling system, and do you use one?
A tile leveling system uses plastic clips and wedges to hold adjacent tiles at the same plane while the thinset cures. This prevents lippage — the condition where one tile edge sits slightly higher than its neighbor, which becomes a tripping hazard and looks unprofessional. We use leveling systems on all large-format tile (anything 12x24 or bigger) and on floors where flatness matters most. The clips are snapped off after curing; nothing is left embedded in the grout line.
Can you match existing tile in another part of the house?
Matching existing tile is difficult — even the same tile from the same manufacturer can vary between production runs. We're honest about this upfront. If you have leftover tile from the original install, that's the most reliable path. If not, we can help you find something in the same color family and size that reads as intentional rather than patched. A clearly defined transition strip between old and new tile is often the cleaner solution.
After the Work Is Done
How long does grout need to cure before the shower can be used?
Standard cement-based grout needs at least 72 hours before the shower should be used — and longer is better. We recommend waiting a full week before running hot water regularly, which causes thermal expansion. Epoxy grout cures faster and is more stain-resistant, but it costs more and is harder to work with. We'll discuss grout type with you before the job so you understand the tradeoffs.
Do grout lines need to be sealed, and how often?
Cement-based grout is porous and will absorb water and stain if left unsealed. We apply a penetrating grout sealer as part of our standard finish on floor tile and wet areas. For maintenance, a reapplication every one to two years is a reasonable schedule for high-traffic areas — a simple water-bead test tells you when it's time. Epoxy grout doesn't need sealing, which is one reason it's worth considering for shower floors.
A tile cracked six months after installation — what causes that?
Cracked tile after installation is almost always a subfloor or substrate issue, not a tile quality issue. If the subfloor flexes — from a joist with too much give, a hollow spot under the tile, or an undersized backer board — the tile above it will eventually crack at the weakest point. This is why subfloor prep is the first thing we address, not an afterthought. If a tile we installed cracks, we want to understand why before we replace it.